Drive past the entrance at NW Crooked Road and NW Fawn Avenue and you'd guess Estates of Chapel Hills is built for cars first. It sits tight against I-435 and Highway 45, the kind of interchange-adjacent address that usually means errands by minivan and weekend walks confined to your own cul-de-sac. That assumption is out of date. Somewhere in the last thirteen years, without much fanfare and without any single agency claiming credit for the whole thing, a paved trail corridor has assembled itself along that same Highway 45 line, and it now runs, with only a couple of interruptions, from a trailhead a few minutes from your neighborhood all the way to the Missouri River.
Nobody planned it as one system. That's the part worth understanding before you write it off as just another suburban path.
Three Agencies, Three Timelines, One Corridor
The oldest piece is the Line Creek Trail, an 8-mile paved route that Hunt Midwest built as general contractor on a $4 million project completed in September 2013, funded jointly by Kansas City, Riverside, Platte County, and a group of adjoining property owners. It was designed as a straightforward connector, giving thousands of nearby residents direct access to the Line Creek Community Center and Line Creek Elementary School. It's also hillier than you'd expect from a suburban path, with a small waterfall visible along the creek bank about a mile and a half in.
The second piece has a different sponsor entirely. Southern Platte Pass was built with a Missouri Department of Transportation grant as part of the regional MetroGreen and Northland Trails Vision Plan, and it reads more like urban infrastructure than a park amenity. On its south side, it begins at K Highway in Parkville and travels east along Highway 45, narrowing into a plain sidewalk as it slips beneath I-29 and 71 before widening back into a full trail as it curves around NW 64th Street and Gower Road. Its north side runs a separate stretch from Cosby Avenue to Highway 9. Along the way it links two cities, three schools, and the Platte County Community Center South. It's not scenic in the way Line Creek Trail is. It's functional, built to move people across a stretch of Platte County that's dense enough to need it.
Those two trails meet at a shared trailhead on N Gower Street, just before NW Waukomis Drive, where there's a posted map, a bike service station, a portable restroom, and a small parking lot. That intersection is the hinge the whole system pivots on.
The Gap That Closed in November 2023
For years, that was as far as the network reached toward Chapel Hills' side of the county. Then in November 2023, Platte County opened the Brush Creek Trail, a 2-mile, 10-foot-wide concrete path with a trailhead at 6010 N. Nevada Avenue in the Thousand Oaks subdivision and a second access point at 15500 NW River Road. It was built specifically to link Thousand Oaks into the Southern Platte Pass system, funded through the county's parks and stormwater sales tax, and Parkville took over its operation and maintenance once it opened.
City meeting records from January 2024 show plans in motion to extend Brush Creek Trail further into Thousand Oaks and across land where the Park Hill School District was planning a new elementary school, with both extensions expected to break ground that spring and summer. That's the next piece of the puzzle, and it matters for anyone near Chapel Hills because it's the segment that would close the remaining distance between the Highway 45 corridor and the neighborhoods sitting just north of it.
Here's what the assembled system looks like when you stop treating it as four separately named trails and start treating it as one corridor:
| Segment | Length | Built / Opened | What it connects |
|---|---|---|---|
| Line Creek Trail | 8 miles | Completed Sept. 2013, $4M | Line Creek Community Center, Line Creek Elementary, Riverside, KCMO |
| Southern Platte Pass | roughly 6.5 miles | MoDOT-funded, Northland Trails Vision Plan | K Highway to N Gower trailhead; two cities, three schools, Community Center South |
| Brush Creek Trail | 2 miles | Opened Nov. 3, 2023 | Thousand Oaks to Southern Platte Pass system |
| N Gower shared trailhead | — | — | Where Line Creek Trail and Southern Platte Pass physically meet |
Where the Pavement Actually Takes You
Ride the corridor east and north far enough and it eventually feeds into the network around English Landing Park, a 68-acre riverside park with three miles of its own walking trails, a boat ramp, picnic shelters, a sand volleyball court, a disc golf course, and a playground, all running parallel to the Missouri River. The park opens daily at 5:30 a.m., early enough for a full loop before most people are pouring their first cup of coffee.
If you'd rather head for something quieter, the Parkville Nature Sanctuary offers a different kind of ending. It's 115 acres of preserved land with nearly three miles of hiking trails, entered off Highway 9 near the Platte County Health Department, and it's run day to day by a part-time on-site director rather than a city parks crew. It's the kind of place that stays a local secret because it isn't on the way to anything else.
None of these destinations were designed around each other. The Line Creek Trail was built for two cities that needed a connector. Southern Platte Pass was built with state highway money to solve a pedestrian access problem along Highway 45. Brush Creek Trail exists because Platte County voters approved a sales tax and a subdivision needed a link. English Landing Park and the Nature Sanctuary predate all of it. What's changed is that the gaps between them have been closing one grant cycle at a time, and the version that exists today, in the second half of 2026, reaches noticeably farther than it did even three years ago.
What This Actually Means Day to Day
If you live in Chapel Hills, the practical takeaway isn't that you can walk out your front door onto a trail. You can't, at least not yet. What you can do is treat the K Highway and Highway 45 corridor the same way you'd treat an on-ramp: a short drive gets you to a system that, once you're on it, doesn't require getting back in the car again for hours. Park at the N Gower trailhead, use the bike service station there if your tires need air, ride the Line Creek Trail toward its northern stretch if you want hills and a waterfall, or head the Southern Platte Pass direction if you're logging miles rather than chasing scenery. If English Landing Park is your destination, plan enough daylight for the ride back, since the return trip along Highway 45's sidewalked stretch under I-29 isn't the kind of segment you want to navigate after dark.
The bigger point is that this corridor didn't happen because someone drew a master plan and executed it in one pass. It happened because three different funding sources, three different governments, and one subdivision's HOA all solved a piece of the same problem within a decade of each other, and the pieces now line up. That's a different story than "there are nice trails nearby," and it's the reason the system is worth understanding as a whole rather than bookmarking one trailhead and calling it done.
If you're already living the day-to-day version of Chapel Hills, this is one more layer of the neighborhood worth knowing beyond the golf carts and the school pickup line. And if you know someone weighing a move to the Northland who values that kind of access, Sarah Johnson (KC) can walk them through what life actually looks like here, trail system included. Schedule a consultation whenever you're ready to talk specifics.